Who paid for the Solar System Street Light
I
want to believe that they can be a way of installing the SOLAR STREET
LIGHT for it to last at least for five or six months before going
permanently bad, in the case i recently look into i realized that the
Solar Street Light installed in
the
streets of Eket in Akwa Ibom state did not last for long but have
permanently gone blank, and i believe the contractor was paid heavily
for the work with the state allocation, this is not a fair deal, there
should be an alternaitve way for this, because the Solar street light
was mostly aim at helping the poor but it goes bad even before the
installer finishes the work just as that of the boreholes and other
basic amenities put in place to help the ordinary man, but it's is so
frustrating to say that most of the project awarded to this contractor
are mostly not properly done especially when it has to do with serving
the ordinary man in the street, I plead with the government to either
look for an alternative way or the Solar System Street Light, or remove
the poles from the street so that it will not start cursing accidents in
the dark.
Leave a Comment